Charger 1
Up to 180 kW · direct current
- Connector 1 CCS1
- Connector 2 CCS2
Basement level 1 · Cl. 18 #35-69 · El Poblado · Medellín, Antioquia
3 chargers · 2 connectors each · 6 cars at a time
Connecting to the station…
Test–
Price now: COP per kWh
The first VOLT station is under construction on basement level 1 of the Palms Avenue mall, on Avenida Las Palmas, in El Poblado, and opens soon. It will have three DC chargers of up to 180 kW, each with two connectors: six cars charging at the same time, 24 hours a day, every day.
Of the six bays, four are CCS2, one is CCS1 and one is GB/T, so they cover European, Korean and Chinese cars as well as those built for the North American market.
3 chargers of 180 kW, 6 bays in total.
Up to 180 kW · direct current
Up to 180 kW · direct current
Up to 180 kW · direct current
Once it opens, you will see the status of each bay in the VOLT app before you leave.
Drive into the Palms Avenue parking and go down to basement level 1.
Follow the VOLT signs to the charging bays.
Loading the map…
A fast charge takes 25 to 35 minutes. Near the station you will find: