Charger 1
Up to 180 kW · direct current
- Connector 1 CCS1
- Connector 2 CCS2
Basement level 1 · Cl. 18 #35-69 · El Poblado · Medellín, Antioquia
3 chargers · 2 connectors each · 6 cars at a time
The first VOLT station is under construction on basement level 1 of Palms Avenue, in El Poblado, and opens soon. It will have three DC chargers of up to 180 kW, each with two connectors: six cars charging at the same time, 24 hours a day, every day.
Of the six bays, four are CCS2, one is CCS1 and one is GB/T, so they cover European, Korean and Chinese cars as well as those built for the North American market.
3 chargers of 180 kW, 6 bays in total.
Up to 180 kW · direct current
Up to 180 kW · direct current
Up to 180 kW · direct current
Once it opens, you will see the status of each bay in the VOLT app before you leave.
Enter through [the vehicle entrance] and go down to basement level 1.
Follow the VOLT signs to the charging bays.
Back into the bay: the connector is on the [left] side.
Loading the map…
A fast charge takes 25 to 35 minutes. Near the station you will find: